Leaving a place in a better state than it was when you arrived, overcoming challenges, determination and resilience, a stunning natural environment. This is The Point.
When Moremac Property Group acquired The Point in 2013 from Stockland, after their 10-year effort to gain project approval, it not only came with controversy surrounding the development, but massive environmental, engineering, political and community challenges.
Moremac have tackled some of the most complex water management systems that the judges have ever seen in Victoria and have created a community of high-quality, coastal-inspired homes set within an environment sensitive to its abundant natural assets, landscapes, and parks.